The Alexander Dawson School Innovation Center represents a comprehensive approach to K-12 science education, featuring specialized learning environments designed to support the school’s innovative curriculum. The 24,000-square-foot, three-story building houses science classrooms and laboratories, as well as a shared makerspace with associated wood and metal shops and storage areas.

The Innovation Center serves as both an educational hub and campus welcome center, creating the first destination for visitors and prospective students. The facility incorporates four high school-level laboratories, three middle school-level laboratories, one K-5-level laboratory, computer labs, and specialized workshop spaces. The building design emphasizes visual connections to the outdoors and campus features while putting internal activities on display through intentional transparency.

The facility achieved LEED Gold certification, reflecting the project’s commitment to sustainable design principles. The building functions are integrated into the campus landscape, creating a cohesive educational environment that aligns facilities with the school’s divisions and departments.

As the project’s mechanical and electrical engineer, RMH provided mechanical and electrical design services, including AV/IT/security systems, and bid and construction-phase services. The design emphasized low energy use by evaluating multiple HVAC system options to optimize performance and efficiency for specialized laboratory and educational spaces.

Home to 11 federal agencies, the Byron G. Rogers Federal Office Building in downtown Denver was targeted by its owner, the U.S. General Services Administration, for an extensive modernization project to significantly improve energy efficiency and deliver advanced updates to this important example of 1960s-era Federal architecture. This design-build project involved comprehensive upgrades to all major building systems housed within the 18-story, 494,000-square-foot office tower and minor improvements to the adjacent courthouse. The upgrades are projected to reduce energy use in the office tower by nearly 70 percent relative to current levels.

In addition to improving building envelope insulation, the most significant energy savings were achieved by implementing a chilled-beam system to replace the building’s inefficient, inflexible mechanical system. A chilled-beam system is an advanced method for distributing heating and cooling throughout the building with minimal energy waste. It primarily uses water at a moderate temperature to condition building spaces. After capturing heat generated by building occupants, computers, lighting, and solar gain, a thermal tank in the basement stores and circulates this heat through the building’s chilled-beam system as needed.

The retrofitted building features additional energy-saving technologies, including 100% LED lighting, enhanced daylighting, and roof-mounted solar thermal collectors that provide all of the building’s domestic hot water. Water-conserving strategies are expected to reduce water use by 40 percent. The comprehensive modernization positions this Federal facility as a model for sustainable government building operations while preserving its architectural significance.

As the project’s mechanical, electrical, and plumbing engineer, RMH provided comprehensive MEP engineering services for this transformative modernization project.

The Student Success Building is the first structure in the Metro State “neighborhood” on the Auraria Higher Education Campus, designated exclusively for use by Metro State students and faculty. Metro State shares the Auraria campus with two other institutions: the University of Colorado Denver and the Community College of Denver. This new facility encompasses approximately 145,000 square feet and includes functional spaces for classrooms, offices, critical support services, the Office of the President, as well as special programs and departments.

Metro State is dedicated to reducing carbon emissions associated with campus operations; therefore, sustainability was a key requirement for this building. As the mechanical and electrical design engineer for the project, RMH implemented high-performance building systems, which feature efficient heating and cooling systems, low-water-use fixtures, and reliable power supplies.

RMH Group provided MEP engineering services for renovating and expanding the University of Colorado at Boulder’s recreation center. The project involved updating the 215,000-square-foot facility and adding 93,000 square feet of new space. The enhanced recreation center now offers expanded weight and cardio areas, a new ice rink with stadium seating and LED lighting, a three-story rock-climbing gym with a bouldering wall, an outdoor aquatics facility, an indoor turf gym, four lighted rooftop tennis courts, a new entrance and lobby, and renovated pools, gyms, and locker rooms.

Focusing on energy efficiency and sustainability goals, the project incorporates innovative heating and cooling systems that significantly reduce energy consumption. Features such as a heat recovery loop, which transfers excess heat to areas like the swimming pools and domestic hot water system, along with evaporative cooling, thermal displacement ventilation, radiant slab heating, and daylight harvesting, all contribute to the building’s energy profile. This recreation center earned LEED Platinum certification upon completion.