The RMH Group provided engineering services for a new 48,000-square-foot behavioral health and acute care facility in Aurora, Colorado, delivering a critical community resource for long-term treatment, detoxification, crisis stabilization, and inpatient mental health care.

Designed to support 61 patient beds across detox, crisis stabilization, and isolation units, the three-story facility also includes therapy spaces, nurse stations, behavioral health support areas, and clinical treatment environments. RMH developed an all-electric building design centered on a high-efficiency heat pump system and advanced building controls to reduce energy consumption while maintaining the stringent ventilation, comfort, and safety requirements of a healthcare facility. The team incorporated specialized behavioral health design considerations throughout the mechanical, electrical, and plumbing systems, including tamper-resistant fixtures, ligature-resistant components, and secure patient environments.

The facility achieved designation as an Xcel Energy Efficient Building by focusing on electrification, energy performance, and sustainable building operations. Working closely with the owner, architect, and contractor, RMH helped align the design with project budget objectives while maintaining performance, safety, and operational goals.

The project earned the 2026 CAHED Collaboration and Innovation Award in recognition of its integrated approach to behavioral healthcare delivery and facility design.

The RMH Group delivered comprehensive mechanical, electrical, and plumbing engineering services for the Children’s Hospital North Expansion. This project transformed a 47,000-square-foot clinic into a 236,000-square-foot pediatric hospital, addressing the growing needs of Northern Colorado and Wyoming families.

Key services included HVAC, medical gas, building automation, energy code compliance, and fire protection systems. The project utilized the Integrated Project Delivery (IPD) method, ensuring efficient collaboration and innovation. Notable features include wireless lighting controls and advanced standby power generators, enhancing energy efficiency and reliability. The expansion also added a new medical office building, an outpatient clinic, and critical infrastructure upgrades. This leading-edge facility now offers comprehensive pediatric services, including orthopedics, cancer care, and emergency services.

The collaboration between the project team and the Owner’s staff led to creating a facility that achieved an Energy Use Intensity (EUI) of 150, surpassing the future compliance benchmark of 172 EUI set by the State of Colorado’s Building Performance Standards for hospitals by 2030.

The RMH Group Has Joined SALAS O'Brein

For more than six decades, we’ve had the privilege of serving our communities, building lasting client relationships, and working alongside incredible employees and partners. Those connections have shaped who we are. As we join Salas O’Brien, we’re excited to build on that foundation with a team that shares our commitment to collaboration, innovation, and technical excellence.