Brigham Young University-Idaho

Rexburg, Idaho

The RMH Group served as mechanical, electrical, and controls engineer for a project to add cogeneration capabilities to BYU-Idaho’s Rexburg campus heating plant. The project began with a conceptual study/economic analysis, which investigated the economic viability of adding cogeneration capabilities. Following completion of the conceptual study/economic analysis, RMH provided follow-on design for installation of a nominal 5.7MWe natural gas turbine with 50,000 pph HRSG that was calculated to have a simple payback of eight years. RMH’s design for the gas turbine featured a fully enclosed evaporative cooling system to increase the turbine output, as well as a turbine enclosure heat reuse system. These turbine system enhancement packages have less than a two-year payback, further improving the overall system payback.

The RMH Group Has Joined SALAS O'Brein

For more than six decades, we’ve had the privilege of serving our communities, building lasting client relationships, and working alongside incredible employees and partners. Those connections have shaped who we are. As we join Salas O’Brien, we’re excited to build on that foundation with a team that shares our commitment to collaboration, innovation, and technical excellence.