  • St. Vrain Sanitation District

    Firestone, Colorado

    The St. Vrain Sanitation District serves an estimated 10,000 residents and businesses over a 130-square-mile portion of Weld County, Colorado. To meet the increasing wastewater treatment demands of this fast-growing region, the District initiated an expansion project to double the capacity of the St. Vrain Wastewater Treatment Plant from 3 million gallons per day (MGD) to 6 MGD. The RMH Group served as the HVAC/plumbing engineer for the initial phase of this expansion project involving three new buildings:  a solids building, an operations building, and a garage/storage facility. The solids building houses a solids separation/dewatering area, a UV disinfection area, ATAD reactors, an SNDR tank, a solids storage area, a chemical feed room, and a small lab. The operations building contains offices, a training/conference room, a lab, a control center, a spare parts storage area, an equipment maintenance area, and a break room. To help reduce building energy consumption, the solids building features evaporative cooling and an energy recovery system, while the operations building utilizes an earth-coupled heat pump system and energy recovery ventilation.
 

St. Vrain Wastewater Treatment Plant Expansion

St. Vrain Sanitation District

Firestone, Colorado

The St. Vrain Sanitation District serves an estimated 10,000 residents and businesses over a 130-square-mile portion of Weld County, Colorado. To meet the increasing wastewater treatment demands of this fast-growing region, the District initiated an expansion project to double the capacity of the St. Vrain Wastewater Treatment Plant from 3 million gallons per day (MGD) to 6 MGD.

The RMH Group served as the HVAC/plumbing engineer for the initial phase of this expansion project involving three new buildings:  a solids building, an operations building, and a garage/storage facility. The solids building houses a solids separation/dewatering area, a UV disinfection area, ATAD reactors, an SNDR tank, a solids storage area, a chemical feed room, and a small lab. The operations building contains offices, a training/conference room, a lab, a control center, a spare parts storage area, an equipment maintenance area, and a break room. To help reduce building energy consumption, the solids building features evaporative cooling and an energy recovery system, while the operations building utilizes an earth-coupled heat pump system and energy recovery ventilation.