• Roche Colorado Campus Projects
  • Roche Colorado

    Boulder, Colorado

    Roche is a research-focused healthcare company that discovers, develops, and provides innovative diagnostic and therapeutic products and services to patients and healthcare professionals. The RMH Group successfully completed a variety of planning and design projects on the Roche Colorado (now CordenPharma) campus in Boulder including the following.
    • Energy Conservation/HVAC Refrigerant Reduction Concept Studies – several studies to reduce energy consumption and to phase out use of environmentally harmful HVAC refrigerants on the Roche Colorado campus
    • Plant 3 HVAC Upgrades - mechanical engineering to upgrade the HVAC systems for the material handling area of Plant 3 including completion of an energy reduction analysis
    • ATL Laboratory Heat Recovery System -  study and follow-on design for a heat recovery system for the lab’s air handling unit intake plenum and exhaust ductwork with the goal of saving energy
    • Warehouse HVAC Upgrades – HVAC recirculation air concept approach for the non-hazardous areas of the warehouse building
    • South Pilot Plant Pures Clean Room –  mechanical and electrical design for new cleanrooms to package pharmaceuticals; project featured supply air system using 100% outside air that is tempered and HEPA filtered,  fully HEPA-filtered exhaust system utilizing VAV controls, flexibility to operate the clean room at either positive or negative pressure (depending on need), and three occupancy control settings to reduce energy use when not in full production mode
    Photo credit:  CordenPharma
 

Roche Colorado Campus Projects

Roche Colorado

Boulder, Colorado

Roche is a research-focused healthcare company that discovers, develops, and provides innovative diagnostic and therapeutic products and services to patients and healthcare professionals. The RMH Group successfully completed a variety of planning and design projects on the Roche Colorado (now CordenPharma) campus in Boulder including the following.

  • Energy Conservation/HVAC Refrigerant Reduction Concept Studies – several studies to reduce energy consumption and to phase out use of environmentally harmful HVAC refrigerants on the Roche Colorado campus
  • Plant 3 HVAC Upgrades - mechanical engineering to upgrade the HVAC systems for the material handling area of Plant 3 including completion of an energy reduction analysis
  • ATL Laboratory Heat Recovery System -  study and follow-on design for a heat recovery system for the lab’s air handling unit intake plenum and exhaust ductwork with the goal of saving energy
  • Warehouse HVAC Upgrades – HVAC recirculation air concept approach for the non-hazardous areas of the warehouse building
  • South Pilot Plant Pures Clean Room –  mechanical and electrical design for new cleanrooms to package pharmaceuticals; project featured supply air system using 100% outside air that is tempered and HEPA filtered,  fully HEPA-filtered exhaust system utilizing VAV controls, flexibility to operate the clean room at either positive or negative pressure (depending on need), and three occupancy control settings to reduce energy use when not in full production mode
Photo credit:  CordenPharma